PPR 51

The sale of this product is suspended.

Try to search similar items from other sellers.

Sold: 0
Uploaded: 09.03.2020
Content: text 31 symbols

Product description

PPR 51


Project Production Work (PPR). Construction of the roadbed

Additional information

Document * .doc; 16 pp.;
   Administratively, the right of way of the road under construction passes through the territory of the Leningrad Region. The territory of the right of way for the construction of the road is located in the zone of temperate continental climate with cold winters and moderately warm summers. By geographical location, the area is influenced by the air masses of the Atlantic, the Arctic basin, as well as the masses formed over the territory of Europe. In winter, winds with a southern component prevail. The average January temperature is around minus 20.0 ° С. The highway of the road under construction passes through waterlogged and wetland areas, overgrown with coniferous, soft-leaved trees with a trunk diameter of up to 32 cm in the lower cut and shrubbery. The main type of bogs I and II encountered is with peat deposits from 0.8 to 1.5 m thick. ";

Feedback

0
Period
1 month 3 months 12 months
0 0 0
0 0 0
In order to counter copyright infringement and property rights, we ask you to immediately inform us at support@plati.market the fact of such violations and to provide us with reliable information confirming your copyrights or rights of ownership. Email must contain your contact information (name, phone number, etc.)

This website uses cookies to provide a more effective user experience. See our Cookie policy for details.