- Arts & Culture 5932
- Business & Economics 680
- Computers 310
- Dictionaries & Encyclopedias 81
- Education & Science 75714
- Engineering 3059
- Aircraft 39
- Audio, Video 3
- Auto 121
- Construction 172
- Digital Technique 2196
- Energetics 8
- Household Appliances 5
- Industry 146
- Military Equipment 80
- Motorcycles 14
- Regulatory Documentation 112
- Ships 13
- Technology and Electronics 128
- Trains 14
- Weapon 8
- Fiction 696
- House, Family & Entertainment 107
- Law 132
- Website Promotion 71
PPR 88 for major pipeline repairs
Uploaded: 09.03.2020
Content: text 31 symbols
Product description
Typical project for the overhaul of pipelines made of carbon and low alloy steels
Additional information
Document * .doc; 25 pp .;
PPR contents: Explanatory note General instructions Technical documentation for the installation of pipelines Building structures for pipelines Instructions for unloading and storing parts and blocks of pipelines Acceptance and preparation of piping parts and fittings for installation 6.1 Valves and actuators 6.2 Flanges and gaskets 6.3 Fasteners 6.4 Compensators 6.5 Bent, forged and welded parts of pipelines 6.6 Supports, pendants and springs Production of pipeline parts at the assembly site Assembling pipeline parts in blocks. General 8.1 General 8.2 Preparation of pipe ends for welding. 8.3 Assembly of flange joints 8.4 Acceptance of assembled blocks 8.5 Thermal insulation of blocks Installation of pipelines. 9.1 Marking the route and installing suspensions and supports 9.2 Lifting, installing and aligning blocks 9.3 Installing gaskets and connecting flanges 9.4 Installing expansion joints and performing cold tightening 9.5 Installing drains, air vents, benchmarks and instrumentation in the pipeline Installation of equipment and drives. 10.1 Installation procedure for valves 10.2 Installation of actuators Preparation and commissioning of mounted pipelines 11.1 Hydraulic testing of pipelines 11.2 Cleaning of the internal surfaces of pipelines Technical documentation for the commissioning of mounted piping Occupational health and safety measures Installation of scaffolding and scaffolds Fire safety measures Sling patterns Electrical safety measures Appendix 1. Wiring diagram pipelines Appendix 2. Defective list ";
Feedback
0Period | |||
1 month | 3 months | 12 months | |
0 | 0 | 0 | |
0 | 0 | 0 |