Complications and accidents during construction and cap

Reviews 0
0 000 X
There are no such quantities in stock
By clicking the button, you agree to terms for buyers
Secure deal
Instant delivery

Product description

Content
3. Absorption of drilling and grouting solutions
3.1. Estimation of the size of drilling mud absorption channels based on the fractional composition of the sludge (Volgogradnipineft method)
3.2. The choice of excipients for the prevention and elimination of lost circulation of drilling muds and cement slurries
4. Accidents with the drill string
4.1. Determination of the depth of breakage of the drill string by the hydraulic weight indicator (GIV)
4.2. Study of fishing and auxiliary tools for accident elimination and technology of their use
6. Gazonefteprovodnyh
6.1. Determination of the maximum possible length of the drill string raised without adding drilling fluid
6.2. Assessment of the type of oil and gas occurrence and determination of initial data for the calculation of well jamming
6.3 Study of equipment for prevention and elimination of open oil and gas fountains
Literature

Main features

  • Content type File
  • Content description 523 kB
  • Added to the site 22.07.2020
Tyumen industrial University

Reviews

No reviews yet

0 000 X
There are no such quantities in stock
By clicking the button, you agree to terms for buyers
Complications and accidents during construction and cap
0 000 X
Secure deal
Instant delivery

Cumulative discount

100 $ the discount is 10%
50 $ the discount is 5%
20 $ the discount is 2%
Check your discount

Amount of purchases from the seller:  $

Your discount:  %

Cumulative discount

100 $ the discount is 10%
50 $ the discount is 5%
20 $ the discount is 2%
Check your discount

Amount of purchases from the seller:  $

Your discount:  %

You viewed