- Arts & Culture 6867
- Business & Economics 669
- Computers 342
- Dictionaries & Encyclopedias 81
- Education & Science 79547
- Abstracts 73
- Astrology 5
- Biology 8
- Chemistry 5029
- Coursework 15614
- Culture 8
- Diplomas 324
- Drawings 1588
- Ecology 5
- Economy 81
- English 81
- Ethics, Aesthetics 3
- For Education Students 17752
- Foreign Languages 11
- Geography 3
- Geology 1
- History 37
- Maps & Atlases 3
- Mathematics 13952
- Musical Literature 2
- Pedagogics 24
- Philosophy 22
- Physics 15123
- Political Science 5
- Practical Work 59
- Psychology 68
- Religion 4
- Russian and culture of speech 8
- School Textbooks 7
- Sociology 9
- Summaries, Cribs 88
- Test Answers 164
- Tests 8865
- Textbooks for Colleges and Universities 32
- Theses 7
- To Help Graduate Students 14
- To Help the Entrant 38
- Vetting 409
- Works 13
- Информатика 8
- Engineering 745
- Fiction 710
- House, Family & Entertainment 86
- Law 133
- Website Promotion 72
Control Econometrics 1
Content: Контрольная Эконометрика 1.doc 98 kB
50 $ | the discount is | 20% |
25 $ | the discount is | 10% |
Product description
1. Find the parameters of the linear regression equation using the method of least squares (OLS).
2. Find the equation of linear regression, using the matrix method.
3. Calculate the correlation coefficient and evaluate the resulting regression equation.
4. Calculate the coefficient of determination and assess the quality of a selected regression equation, these.
5. Calculate the average approximation error.
6. Evaluate the statistical significance of linear regression using the F-test Fisher.
7. Assess the statistical significance of the parameters of the linear regression equation (a and b), and correlation coefficient using the Student t-test.
8. Construct confidence intervals for the parameters of the linear regression equation (a and b) where the significance level α = 0,05.
There are data on the ten factories one industry on the levels of power per work X (ths. KWh / h) and the level of productivity per worker per year Y (thous. Pcs. Ed.):
X 9,4 6,0 6,1 7,2 6,8 9,4 10,5 11,4 11.5 12,1
Y 2 7 4 5 6 5 7 8 9 8
Feedback
0Period | |||
1 month | 3 months | 12 months | |
0 | 0 | 0 | |
0 | 0 | 0 |