Secure deal
Instant delivery
Product description
1. Solve the following tasks:
1.13 The cost of railway transportation of cargo per 1 km (AB) is equal to k1 p., In a car (PC) - k2 p. (k1 2). At what point P is necessary to begin construction of the highway, maybe cheaper to deliver cargo from point A to C? It is known that | AB | = a, | BC | = b
2. Carry out a full investigation of these functions and build their schedules.
2.13 y = (x2 - x - 1) / (x2 - 2x)
3. Carry out a full investigation of these functions and build their schedules.
3.13 y = (x + 2) e1- x
4. Find the minimum and maximum values of the function y = f (x) on the interval [a; b]
4.13 y = (x - 1) e-x, [0; 3]
1.13 The cost of railway transportation of cargo per 1 km (AB) is equal to k1 p., In a car (PC) - k2 p. (k1 2). At what point P is necessary to begin construction of the highway, maybe cheaper to deliver cargo from point A to C? It is known that | AB | = a, | BC | = b
2. Carry out a full investigation of these functions and build their schedules.
2.13 y = (x2 - x - 1) / (x2 - 2x)
3. Carry out a full investigation of these functions and build their schedules.
3.13 y = (x + 2) e1- x
4. Find the minimum and maximum values of the function y = f (x) on the interval [a; b]
4.13 y = (x - 1) e-x, [0; 3]
Main features
- Content type File
- Content description 200,5 kB
- Added to the site 12.08.2020
Additional information
Detailed solution. Decorated in Microsoft Word 2003. (Target decided to use formula editor)
For the convenience of viewing IDZ solutions on smartphones, an additional file in PDF format is sent
For the convenience of viewing IDZ solutions on smartphones, an additional file in PDF format is sent
Reviews
No reviews yet
Secure deal
Instant delivery