Objective 1

To determine the rate of change of service (480 minutes) for the electrician on duty on the following data:

1. Electrician 20 times for a change of control of the transmitter, and 10 times the transmitter adjusts to the new frequency.

2. Operational time per operation control is 1.2 minutes, and one adjustment step - 5 minutes.

3. The additional cost factor is 1.2.

4. Provision of free time - 5%.

Task 2

Determine the number of savings telegraph the following data: the current rate of production of 55 telegrams per hour projected - 65 telegrams per hour. Development of the average shift of 400 telegrams. Telegrapher operated for 25 working days of the month, the total number of similar jobs in the area 10.