Outage for installation of the pipeline from prv.sect Outage for installation of the pipeline from prv.sect
Outage for installation of the pipeline from prv.sect
Outage for installation of the pipeline from prv.sect

Outage for installation of the pipeline from prv.sect

Sold 2 Reviews 0
0 000 X
There are no such quantities in stock
By clicking the button, you agree to terms for buyers
Secure deal
Instant delivery

Product description

Thesis project "BPD for installation of the pipeline from the private sector" program of the schools.
Explanatory note Introduction
1 audit and technical section
1.1 Source data and characteristics of the object
1.2 Characteristics of gas and climatic data
1.3 Calculation of parameters of gas fuel
1.4 Calculation of gas consumption by the private sector
1.5 Choice and justification of gas supply systems
1.6 Hydraulic calculation of gas pipelines of low pressure
1.7 Hydraulic calculations in-house pipelines
1.8 equipment Selection SHRP
1.9 Specification of customer´s equipment
1.10 Specification of the contractor´s equipment
2 Purpose, rationale and composition of the outage
2.1 Technology and ways of its perfection
2.2 Choice of method of production of works
2.3 Characteristics of the soil and the sheet of earthwork
2.4 Selection of leading mechanisms, machines and devices
2.5 Statement of the main and auxiliary materials
2.6 Calculation of labor costs and wages
2.7 Summary of labor costs

6 of the drawings in the Compass A1
Local estimates
WITH the customer and the contractor

Main features

  • Content type File
  • Content description 334,64 kB
  • Added to the site 12.11.2015

Images

Reviews

No reviews yet

0 000 X
There are no such quantities in stock
By clicking the button, you agree to terms for buyers
Outage for installation of the pipeline from prv.sect
1 Sold 2 Reviews 0
0 000 X
Secure deal
Instant delivery

You viewed