- Arts & Culture 5939
- Business & Economics 689
- Computers 319
- Dictionaries & Encyclopedias 81
- Education & Science 75882
- Abstracts 252
- Astrology 4
- Astronomy 1
- Biology 8
- Chemistry 2221
- Coursework 15546
- Culture 9
- Diplomas 411
- Drawings 574
- Ecology 6
- Economy 83
- English 75
- Ethics, Aesthetics 3
- For Education Students 17613
- Foreign Languages 11
- Geography 3
- Geology 1
- History 89
- Maps & Atlases 5
- Mathematics 13856
- Musical Literature 2
- Pedagogics 19
- Philosophy 23
- Physics 14857
- Political Science 5
- Practical Work 101
- Psychology 60
- Religion 4
- Russian and culture of speech 8
- School Textbooks 7
- Sexology 42
- Sociology 9
- Summaries, Cribs 87
- Test Answers 150
- Tests 9243
- Textbooks for Colleges and Universities 32
- Theses 24
- To Help Graduate Students 14
- To Help the Entrant 37
- Vetting 364
- Works 13
- Информатика 10
- Engineering 3063
- Fiction 696
- House, Family & Entertainment 107
- Law 132
- Website Promotion 71
Outage for installation of the pipeline from prv.sect
Refunds: 0
Uploaded: 12.11.2015
Content: ДипломныйпроектГРП.rar 334,64 kB
Product description
Thesis project "BPD for installation of the pipeline from the private sector" program of the schools.
Explanatory note Introduction
1 audit and technical section
1.1 Source data and characteristics of the object
1.2 Characteristics of gas and climatic data
1.3 Calculation of parameters of gas fuel
1.4 Calculation of gas consumption by the private sector
1.5 Choice and justification of gas supply systems
1.6 Hydraulic calculation of gas pipelines of low pressure
1.7 Hydraulic calculations in-house pipelines
1.8 equipment Selection SHRP
1.9 Specification of customer´s equipment
1.10 Specification of the contractor´s equipment
2 Purpose, rationale and composition of the outage
2.1 Technology and ways of its perfection
2.2 Choice of method of production of works
2.3 Characteristics of the soil and the sheet of earthwork
2.4 Selection of leading mechanisms, machines and devices
2.5 Statement of the main and auxiliary materials
2.6 Calculation of labor costs and wages
2.7 Summary of labor costs
6 of the drawings in the Compass A1
Local estimates
WITH the customer and the contractor
Feedback
0Period | |||
1 month | 3 months | 12 months | |
0 | 0 | 0 | |
0 | 0 | 0 |