- Arts & Culture 5939
- Business & Economics 689
- Computers 319
- Dictionaries & Encyclopedias 81
- Education & Science 75882
- Engineering 3063
- Aircraft 39
- Audio, Video 3
- Auto 121
- Construction 171
- Digital Technique 2201
- Energetics 8
- Household Appliances 5
- Industry 146
- Military Equipment 80
- Motorcycles 14
- Regulatory Documentation 112
- Ships 13
- Technology and Electronics 128
- Trains 14
- Weapon 8
- Fiction 696
- House, Family & Entertainment 107
- Law 132
- Website Promotion 71
PPR 12
Uploaded: 09.03.2020
Content: text 31 symbols
Additional information
Document * .doc; 41 pp .; This project provides for the construction of a high-level water supply system d = 355 mm L = 1057 m from PVP PN16 pipes with a tie-in to the existing network from st. pipes d = 325 mm on the street M.Novikova. Inputs for a residential building under construction are designed from the laid water supply. In the work zone there are underground utilities (see Fig. 7) and power lines of 35, 220 and 1 kV (see Works under power lines, Fig. 8-10). Surface drainage is carried out in the existing sewer. The dimensions of the trench and pits are calculated based on the technology of the work. ";
Feedback
0Period | |||
1 month | 3 months | 12 months | |
0 | 0 | 0 | |
0 | 0 | 0 |