PPR 33
The sale of this product is suspended.

The seller is blocked and sales of the product are suspended

Product description

Project Production Work (PPR). Installation of sanitary-engineering systems of a precast concrete building (internal cold and hot water supply, internal sewage and drains, heating and heat supply, ventilation)

Main features

  • Content type Text
  • Content description 31 symbols
  • Added to the site 09.03.2020
Document * .doc; 43 pp .; TOC CONTENT: INTRODUCTION I. General Provisions II. Technical and economic indicators of the facility III. Work schedule IV. Construction Master Plan V. Local Network Schedule EXPLANATORY NOTE I. Organizational Decisions II. General production methods III. Assembly and assembly work IV. Testing of internal sanitary systems V. Quality control of work VI. Logistics VII. Safety at work TECHNOLOGICAL CARDS 1. Installation of metal ducts for internal ventilation systems 2. Installation of heating system pipelines from metal-polymer pipes 3. Installation of internal sewage systems from polypropylene pipes 4. Installation of collector systems for internal water supply with LDPE pipes ";

Reviews

No reviews yet

The sale of this product is suspended.

You viewed