PPR 36

Affiliates: 0,01 $how to earn
Pay with:
i agree with "Terms for Customers"
Sold: 0
Uploaded: 09.03.2020
Content: text 31 symbols

Product description

PPR 36

Project Production Work (PPR). Installation of ventilation and heating systems

Additional information

Document * .doc; 101 pp.; PPR content: Section name Project content List of workers who need to be familiarized with PPR Schedule for persons responsible for safe work performance Explanatory note General part Technological sequence of work performance Instructions on methods for exercising instrumental control over production and work quality Labor safety measures Fire safety Activities Environmental protection and construction waste disposal Noise protection Appendix 1 Graphic part Stroygenplan for the period of installation of equipment on the roof. M 1: 500 Section 1-1 Installation diagrams of the ventilation system Installation of air ducts. Installation of pipelines of hydraulic cold supply systems. Installation of equipment. Heating system installation diagrams. Pipeline passage through the ceiling. Laying the pipeline in the ceiling. Installation of radiators. Signs. The design of the signal fence Schemes of slinging Schedule of work. Schedule of need for working personnel Object: Administrative building Address: Moscow, Central Administrative District, Syezdinsky per., Vlad. 3, p. 1-2 ";

Feedback

0
No feedback yet.
In order to counter copyright infringement and property rights, we ask you to immediately inform us at support@plati.market the fact of such violations and to provide us with reliable information confirming your copyrights or rights of ownership. Email must contain your contact information (name, phone number, etc.)