Reconstruction of the power supply system of the boiler
Reviews 0
Secure deal
Instant delivery
Product description
KSU them. A. Baitursynov; Kostanay / Kazakhstan; 81 pages; Year of performance 2012. Thesis The reconstruction of the power supply system of the boiler house No. 3 in Kostanay includes the sections of power supply, labor and environmental protection, electrification of the mechanical repair base, relay protection and much more.
Brief description of the enterprise;
Power supply;
Electrification of the mechanical repair base (box);
Operation organization;
Labor and environmental protection;
Main technical and economic indicators of the project
Brief description of the enterprise;
Power supply;
Electrification of the mechanical repair base (box);
Operation organization;
Labor and environmental protection;
Main technical and economic indicators of the project
Main features
- Content type File
- Content description 2022,46 kB
- Added to the site 31.10.2018
Images
Additional information
AutoCad
Reviews
No reviews yet
Secure deal
Instant delivery