The scheme of reducing the speed of the bridge crane in
Reviews 0
Secure deal
Instant delivery
Product description
Proposal to limit the speed of the bridge crane when approaching the marginal zone of the shop. With asynchronous motors with a phase rotor. Near the parking zone of the crane, a boom is installed, which switches the limit switch on the crane bridge to a position that excludes all speeds on the controller, except the minimum one.
Main features
- Content type File
- Content description 1095,07 kB
- Added to the site 11.06.2019
Additional information
The file in Compass-15 format
Reviews
No reviews yet
Secure deal
Instant delivery