Secure deal
Instant delivery
Product description
The project provides for the supply of natural gas to the administrative building. The gas supply source is an external gas pipeline from the hydraulic fracturing unit. The project carries out the layout of the internal gas pipeline of natural gas of low pressure, the gas pressure in front of consumers is 1.3 kPa. The gas pipelines are laid openly over the steel structures of the building on brackets. At the input of the gas pipeline inside the building of ABK, the valve is thermo-locking DN40, the safety shut-off valve is electromagnetic DN40.
The format is DWG, compatible with AutoCAD 2004-2017, Compass, ZWCAD, nanoCAD, BricsCAD, etc.
The format is DWG, compatible with AutoCAD 2004-2017, Compass, ZWCAD, nanoCAD, BricsCAD, etc.
Main features
- Content type File
- Content description 173,75 kB
- Added to the site 18.12.2017
Reviews
No reviews yet
Secure deal
Instant delivery